MAYES COUNTY FAIRGROUNDS-EARTHWORK & STORM DRAINAGE BID PACKAGE
Subcontractor
- Value: $1,400,000
- Time for Completion: 9 months
- Owner: Mayes County
- Construction Manager: Flintco
- Flintco’s Project Manager: David Lawson 918-724-5696
- Flintco’s Superintendent: Dean Meislahn 918-232-6797
- Engineering/Architectural Firm: BKL Architects
- Architect: Kim Reeves
- Engineer: George Rochelle 918-835-9855
Description of Project:
- 36 Acre Site Development
- 70,000 C.Y. of Excavation
- 81,100 SF Detention Pond
- 80,000 S.F. Building Pad including 42” Lime Stabilized Select Fill
- 200,000 S.F. of Gravel, Concrete, & Asphalt Drives and Parking Lots
- 17,400 Tons of Aggregate
- 25,000 S.Y. of Geotextile Fabric
- 2,100 L.F. of Storm Drainage Improvements including 18” – 36” Drainage Pipe
- 450 L.F. of Concrete Trickle Channel
- 25’ x 65’ Concrete Spillway
- 420 L.F. of 8” Perf French Drain