CITY OF BIXBY

CITY OF BIXBY

FRY CREEK BRIDGE EROSION CONTROL PROJECT

Prime Contractor

  • Value: $250,000
  • Time for Completion: 3 months
  • Owner: City of Bixby
  • Inspector: Thomas Keller 918-630-5724
  • Engineer: CGA Engineers
  • Reference Contact: Dwain Garner 918-749-5800

Description of Project:

    • 8,100 S.F. of Rip Rap Removal
    • 1,000 C.Y. of Excavation
    • 10,500 S.F. of Bank Stabilization
    • 450 S.Y. of Concrete Sloped Paving under Bridge at 2:1 Slope
    • 800 S.Y. of Grouted Rip Rap
    • 200 L.F. of Storm Drainage Pipe installed on a 35 Degree Slope
    • SMD Inlets and Cast in Place Concrete End Sections w/ Energy Dissipators