FRY CREEK BRIDGE EROSION CONTROL PROJECT
Prime Contractor
- Value: $250,000
- Time for Completion: 3 months
- Owner: City of Bixby
- Inspector: Thomas Keller 918-630-5724
- Engineer: CGA Engineers
- Reference Contact: Dwain Garner 918-749-5800
Description of Project:
- 8,100 S.F. of Rip Rap Removal
- 1,000 C.Y. of Excavation
- 10,500 S.F. of Bank Stabilization
- 450 S.Y. of Concrete Sloped Paving under Bridge at 2:1 Slope
- 800 S.Y. of Grouted Rip Rap
- 200 L.F. of Storm Drainage Pipe installed on a 35 Degree Slope
- SMD Inlets and Cast in Place Concrete End Sections w/ Energy Dissipators